e-Mail
Sprachauswahl

« back

WELDWARE®

welding technology advisory system for calculating heat management during welding operations on the basis of a base-metal database and regression equations.

applications of WELDWARE®:
    optimisation of heat input during welding
    prevention and analysis of damage
    construction supervision
    optimisation of chemical composition during steel production
    short-time post-heating
    standards adaptation
    training of welding technology personnal

sample application:

building supervision of the longest sea bridge in Heringsdorf, Germany.

total building cost: 22 Mio DM
length of bridge: 550 m

problem:
welding of thick-walled water-accessible supports from steel X52, X60, X65 under conditions of assembly.

what was done:
Determining a preheating temperature for non-crack welding considering geometrical and welding conditions.

If requested, we also offer training events !

 Demo : Download basic version (ScreenCam97-ZIP / 689 KB)
Download auxiliary modules (ScreenCam97-ZIP / 686 KB)

» e-mail: info@weldware.de
Zum Seitenanfang

TOP